Prinza

Plaza de Toros de Marbella

Actions such as repairing the damage to the roof, renovation of the pool, painting and barriers are being carried out.

A new electrical system has been installed throughout the square, providing the bullring with a fire protection and lighting system in case of emergencies.

Among the actions carried out by Prinza Construcciones are the application of anti-corrosion treatments and the reconstruction of concrete façade elements. The exterior pavements and stairs are also being repaired. In the toilets, doors and phenolic partitions adapted for people with reduced mobility were installed.